After bipartisan cooperation between our federal agencies and our state and local governments, the U.S. Environmental Protection Agency has announced two new, near-term projects to address the flow of sewage and wastewater, as well as sediment and trash along our border with Mexico. Congressman Peters and his colleagues have been able to add tens of millions of dollars to the Border Water Infrastructure Program over the past several years to pay for shorter-term projects like the ones announced by the EPA yesterday. And, last year the delegation secured $300 million to fund a longer-term, major infrastructure project to fix this environmental and health crisis through the U.S.-Mexico-Canada Agreement (USMCA).
This is further described in a September 2nd piece for Courthouse News Service, posted below:
EPA Announces Short-Term Projects to Plug Border Sewage Flow
By Bianca Bruno
September 2nd, 2020
SAN DIEGO (CN) â Emphasizing the âunprecedentedâ bipartisan cooperation between local and state governments, Border Patrol and the International Boundary & Water Commission, EPA Administrator Andrew Wheeler announced short-term projects Wednesday to plug the international sewage flow across the U.S.-Mexico border.
The two projects â which will cost $25 million and are funded by the EPAâs Border Water Infrastructure Program â will control sewage and wastewater, sediment and trash that flows from the Tijuana River across the U.S.-Mexico border into San Diego, Wheeler said during a press conference Wednesday at the U.S. Coast Guard station in San Diego.
They are separate from the $300 million earmarked in the U.S.-Mexico-Canada Agreement for wastewater infrastructure projects along the U.S.-Mexico border.
San Diego leaders are lobbying for most of the USMCA funds to be spent to stop the sewage flow from Tijuana, something Wheeler acknowledged Wednesday, saying âmost of it will come here.â
âWe are working with Mexico and want to make sure we are solving the problems on both sides, not just this side,â Wheeler said, noting the funds could be âone time onlyâ and the EPA is prioritizing projects which will âuse the money to solve the problem for the next generation.â
In the short term, the EPA is entering into a contract with the IBWC to divert 10 million gallons of additional wastewater a day for treatment, Wheeler said. The EPA is paying to fund the construction and design of the diversion.
It is a project Imperial Beach Mayor Serge Dedina said will have an immediate impact on beach closures in his city due to contamination. As mayor of the southernmost coastal city in California, Dedina has been calling for the overhaul of international wastewater treatment for years and joined other cities and the state in suing to force compliance with the Clean Water Act.
âOur residents in Imperial Beach, we faced â like everyone else around the world â a pandemic, we faced economic devastation,â Dedina said.
âBut unlike everyone else in the world we also faced a sewage apocalypse, where 160 days this year our beach has been closed. When our residents needed the beach the most, they didnât have it,â he added.
Dedina said ongoing sewage infrastructure improvement projects have already reduced the international sewage flow âto zero for the first time this year.â The Poniente Collector project was completed within the past month using $3.9 million in EPA funding to keep 4.5 million gallons of sewage a day from entering the Tijuana River, Wheeler said Wednesday.
Reducing the flow by another 10 million gallons that will be diverted to the wastewater treatment plant âwill have a huge impact on keeping our beaches clean,â Dedina said.
But keeping the pressure on Mexico to improve its infrastructure across the border âis really going to be the key to this issueâ he added.
âWeâve got to push Mexico to fix its sewer system, theyâve got to look at water reuse seriously to make sure thereâs zero flow from Tijuana going anywhere near the ocean,â Dedina said.
A second project will focus on better controlling trash and sediment which flows through an area called Smugglerâs Gulch â just north of the U.S.-Mexico border.
The EPA will work with the city of San Diego to come up with a permanent solution to control the rubbish which would otherwise flow into the Pacific Ocean. The project also aims to reduce flooding risk to the nearby community.